PCB, EIA, EMP AUDIT & CONSULTANCY
| Environment Impact Assessment (EIA) | Environmental Management Plans (EMP) | Water Audits etc. |
An EIA is an assessment and evaluation of the predicted human environmental health impact, changes to
![]() |
Aqua Designs has a complete facility to take up EIA studies which includes:
- Collection Of Base Line Environmental Information
- Land Use Pattern Topography
- Information On Quantities And Characteristics Of Water(S)
- Soil Characteristics
Aqua Designs has successfully completed many EIA projects for all types of industries
Environmental Management Plan(EMP) Aqua Designs is completely equipped with trained environmental engineers and scientists to take up Environmental Management Plans. This Environmental Management Plan outlines a series of Impact Mitigation and Monitoring Plans to address these environmental and social challenges.
Individual plans exist for:
- Air, Noise And Vibration
- Surface And Groundwater
- Land And Topography
- Flora And Fauna
- Hazardous Materials/Waste
- Worker Health & Safety
- Public Consultation And Participation
Community Development Program:
- Education
- Social Culture
- Infrastructure
- Economic
- Public Health
Water Audits The commodity water systems that deliver today have greater value than ever before. Water supply, treatment, storage and pumping, all add value to the water resources. With mounting infrastructure costs and growing constraints on water resources, water audits are necessary.
The Water Audit Program is packaged specifically for each client to analyze the water from supply all the way through to the customer meter water usage. The goal of the program is to increase revenue and decrease water loss.
The analysis generally includes the following:
- Production Review
- Distribution System Confirmation
- Test And Calibrate Source Meters
- Large & Small Meter Consumption Sizing And Application Analysis
- Non-Metered Usage Analysis
- Consumption Review
- Leak Detection Survey Etc